Chestnut 345 kV (AH1-541) is listed in the PJM interconnection queue as a 27.7 MW hybrid project in Macon County, IL. The filing names Chestnut as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 1, 2028.

Queue IDAH1-541
Project nameChestnut 345 kV
Status (as published)Active
SubstationChestnut
Point of interconnectionChestnut 345 kV
CountyMacon
StateIL
Voltage345 kV
Capacity27.7 MW
Resource (as published)Solar,Storage,Hybrid
Resource categoryHybrid (normalized for filtering)
Target commercial operation2028-03-01
Source datasetcycle

Same substation and county

Chestnut substation: 3 requests in the PJM queue, 2 active totaling 347.7 MW.

Queue IDProjectMWResourceStatus
C01-2046Chestnut 345 kV320BatteryActive
AD2-159Chestnut 345kV33WindWithdrawn

Macon, IL: 5 requests in the PJM queue, 3 active totaling 387.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperGolden Harvest Energy, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleTC2
StagePhase 3
MW energy92.4
MW capacity27.72
MFO92.4
Submitted date9/10/2021
Last updated9/3/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first