Chestnut 345 kV
PJM queue ID AH1-541
Chestnut 345 kV (AH1-541) is listed in the PJM interconnection queue as a 27.7 MW hybrid project in Macon County, IL. The filing names Chestnut as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 1, 2028.
| Queue ID | AH1-541 |
|---|---|
| Project name | Chestnut 345 kV |
| Status (as published) | Active |
| Substation | Chestnut |
| Point of interconnection | Chestnut 345 kV |
| County | Macon |
| State | IL |
| Voltage | 345 kV |
| Capacity | 27.7 MW |
| Resource (as published) | Solar,Storage,Hybrid |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2028-03-01 |
| Source dataset | cycle |
Same substation and county
Chestnut substation: 3 requests in the PJM queue, 2 active totaling 347.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2046 | Chestnut 345 kV | 320 | Battery | Active |
| AD2-159 | Chestnut 345kV | 33 | Wind | Withdrawn |
Macon, IL: 5 requests in the PJM queue, 3 active totaling 387.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Golden Harvest Energy, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 92.4 |
| MW capacity | 27.72 |
| MFO | 92.4 |
| Submitted date | 9/10/2021 |
| Last updated | 9/3/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.