Radford's Run Wind Farm
PJM queue ID W4-005
Radford's Run Wind Farm (W4-005) is listed in the PJM interconnection queue as a 39.8 MW wind project in Macon County, IL. The filing names Blue Mound-Latham as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2019.
| Queue ID | W4-005 |
|---|---|
| Project name | Radford's Run Wind Farm |
| Status (as published) | In Service |
| Substation | Blue Mound-Latham |
| Point of interconnection | Blue Mound-Latham |
| County | Macon |
| State | IL |
| Voltage | Not reported |
| Capacity | 39.8 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2019-06-01 |
| Source dataset | serial |
Same substation and county
Blue Mound-Latham substation: 2 requests in the PJM queue, 1 active totaling 39.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AA1-086 | Blue Mound-Latham | 26 | Wind | Withdrawn |
Macon, IL: 5 requests in the PJM queue, 3 active totaling 387.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 306 |
| MW capacity | 39.8 |
| MFO | 306 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.