Substation Scout

Avon substation interconnection queue

1 active project totalling 26.8 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
26.8active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-338 Avon 138 kV 138 81.2 Battery Withdrawn
AF1-127 Avon 345 kV 345 53.6 Solar Withdrawn
AE2-339 Grassy Plains 138 26.8 Solar Under Construction

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.