Fayette, KY interconnection queue

2 active projects totalling 50.8 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
50.8active MW
4total filed
Queue IDProjectkVMWResourceStatus
AE2-338 Avon 138 kV 138 81.2 Battery Withdrawn
AF1-127 Avon 345 kV 345 53.6 Solar Withdrawn
AE2-339 Grassy Plains 138 26.8 Solar Under Construction
AH1-004 Avon - Renaker 138 kV 138 24 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.