Fayette, KY interconnection queue
2 active projects totalling 50.8 MW in the PJM queue, plus 2 with terminal status (shown greyed).
2active projects
50.8active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-338 | Avon 138 kV | 138 | 81.2 | Battery | Withdrawn |
| AF1-127 | Avon 345 kV | 345 | 53.6 | Solar | Withdrawn |
| AE2-339 | Grassy Plains | 138 | 26.8 | Solar | Under Construction |
| AH1-004 | Avon - Renaker 138 kV | 138 | 24 | Solar | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.