Avon - Renaker substation interconnection queue
2 active projects totaling 42 MW in the PJM queue.
2 PJM queue filings name Avon - Renaker as the point of interconnection, all in KY.
Target commercial operation date as filed: Sep 2029 (2 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: EKPC (2 filings).
2active projects
42active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-004 | Avon - Renaker 138 kV | 138 | 24 | Solar | Active | Sep 2029 |
| AG2-081 | Avon - Renaker 138 kV | 138 | 18 | Solar | Active | Sep 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Fayette County, KY
- Avon: 1 active, 26.8 MW of 3 filed
Other PJM queue substations in Montgomery County, KY
No other substation in Montgomery County, KY is named as a point of interconnection in the PJM queue.