Grassy Plains

PJM queue ID AE2-339

Grassy Plains (AE2-339) is listed in the PJM interconnection queue as a 26.8 MW solar project in Fayette County, KY. The filing names Avon as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of October 29, 2027.

Queue IDAE2-339
Project nameGrassy Plains
Status (as published)Under Construction
SubstationAvon
Point of interconnectionAvon 138 kV
CountyFayette
StateKY
Voltage138 kV
Capacity26.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-10-29
Source datasetserial

Same substation and county

Avon substation: 3 requests in the PJM queue, 1 active totaling 26.8 MW.

Queue IDProjectMWResourceStatus
AE2-338Avon 138 kV81.2BatteryWithdrawn
AF1-127Avon 345 kV53.6SolarWithdrawn

Fayette, KY: 4 requests in the PJM queue, 2 active totaling 50.8 MW.

A substation with the same name is named in PJM transmission planning materials: Avon (EKPC, 1 mention).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy40
MW capacity26.8
MFO40

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first