Substation Scout

Montgomery, KY interconnection queue

1 active project totalling 18 MW in the PJM queue, plus 5 with terminal status (shown greyed).

1active projects
18active MW
6total filed
Queue IDProjectkVMWResourceStatus
AI1-159 Mount Sterling - Sideview 69 kV 69 35 Hybrid Withdrawn
AG1-208 Sideview-Mt Sterling 69 kV 69 21.9 Solar Withdrawn
AG2-081 Avon - Renaker 138 kV 138 18 Solar Active
AG1-381 Hope 69 kV 69 17.4 Solar Withdrawn
AG2-671 Hope - Frenchburg 69 kV 69 11.9 Solar Withdrawn
AH1-464 Hinkston 24.9 kV 24.9 7.2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.