Substation Scout

Hay Road Units 5, 6, 7, 8

PJM queue ID T52

Hay Road Units 5, 6, 7, 8 (T52) is listed in the PJM interconnection queue as a 20 MW gas project in New Castle County, DE. The filing names Red Lion as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 1, 2008.

Queue IDT52
Project nameHay Road Units 5, 6, 7, 8
Status (as published)In Service
SubstationRed Lion
Point of interconnectionRed Lion 500kV
CountyNew Castle
StateDE
Voltage500 kV
Capacity20 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2008-05-01
Source datasetserial

Same substation and county

Red Lion substation: 5 requests in the PJM queue, 3 active totaling 588.3 MW.

Queue IDProjectMWResourceStatus
B47Hay Road 5, 6, 7545GasIn Service
X1-097Red Lion Energy Center23.3OtherIn Service
D15Red Lion 500kV550GasWithdrawn
D14Red Lion 500kV190GasWithdrawn

New Castle, DE: 65 requests in the PJM queue, 31 active totaling 1,405.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity20
MFO565

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.