Shoreham Energy Units 1-3 (R74) is listed in the PJM interconnection queue as a 4.8 MW gas project in Atlantic County, NJ. The filing names Carlls Corner as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of November 14, 2008.
| Queue ID | R74 |
|---|---|
| Project name | Shoreham Energy Units 1-3 |
| Status (as published) | In Service |
| Substation | Carlls Corner |
| Point of interconnection | Carlls Corner |
| County | Atlantic |
| State | NJ |
| Voltage | Not reported |
| Capacity | 4.8 MW |
| Resource (as published) | Methane |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2008-11-14 |
| Source dataset | serial |
Same substation and county
Carlls Corner substation: 8 requests in the PJM queue, 1 active totaling 4.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1442 | Carlls Corner 69 kV | 50 | Battery | Withdrawn |
| T63 | Carlls Corner | 27.2 | Gas | Withdrawn |
| U1-066 | Carll's Corner Units 1 & 2 | 18 | Other | Deactivated |
| W4-041 | Carlls Corner 69kV | 7.6 | Solar | Withdrawn |
| AE2-106 | Carlls Corner 12 kV | 1.6 | Hybrid | Withdrawn |
| AE2-087 | Carlls Corner 12 kV | 1.5 | Hybrid | Withdrawn |
| AG2-144 | Carlls Corner 12 kV | 0.6 | Solar | Withdrawn |
Atlantic, NJ: 93 requests in the PJM queue, 12 active totaling 301.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 4.8 |
| MW capacity | 4.8 |
| MFO | 4.8 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.