Wolf Glade 138 kV

PJM queue ID C01-2252

Wolf Glade 138 kV (C01-2252) is listed in the PJM interconnection queue as a 120 MW battery project in Carroll County, VA. The filing names Wolf Glade as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 30, 2030.

Queue IDC01-2252
Project nameWolf Glade 138 kV
Status (as published)Active
SubstationWolf Glade
Point of interconnectionWolf Glade 138 kV
CountyCarroll
StateVA
Voltage138 kV
Capacity120 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-06-30
Source datasetcycle

Same substation and county

Wolf Glade substation: 2 requests in the PJM queue, 1 active totaling 120 MW.

Queue IDProjectMWResourceStatus
AH1-172Wolf Glade 34.5 kV12SolarWithdrawn

Carroll, VA: 9 requests in the PJM queue, 2 active totaling 120 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperIOWN Energy Projects LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy120.0
MW capacity120.0
MFO120.0
Submitted date4/27/2026
Last updated6/5/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.