Wolf Glade 138 kV
PJM queue ID C01-2252
Wolf Glade 138 kV (C01-2252) is listed in the PJM interconnection queue as a 120 MW battery project in Carroll County, VA. The filing names Wolf Glade as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 30, 2030.
| Queue ID | C01-2252 |
|---|---|
| Project name | Wolf Glade 138 kV |
| Status (as published) | Active |
| Substation | Wolf Glade |
| Point of interconnection | Wolf Glade 138 kV |
| County | Carroll |
| State | VA |
| Voltage | 138 kV |
| Capacity | 120 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-06-30 |
| Source dataset | cycle |
Same substation and county
Wolf Glade substation: 2 requests in the PJM queue, 1 active totaling 120 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-172 | Wolf Glade 34.5 kV | 12 | Solar | Withdrawn |
Carroll, VA: 9 requests in the PJM queue, 2 active totaling 120 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | IOWN Energy Projects LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 120.0 |
| MW capacity | 120.0 |
| MFO | 120.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/5/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.