Wolf Glade substation interconnection queue
1 active project totaling 120 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Wolf Glade as the point of interconnection, all in Carroll County, VA.
Target commercial operation dates as filed run from Dec 2022 to Jun 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
1active projects
120active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2252 | Wolf Glade 138 kV | 138 | 120 | Battery | Active | Jun 2030 |
| AH1-172 | Wolf Glade 34.5 kV | 34.5 | 12 | Solar | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.