Carroll, VA interconnection queue
3 active projects totalling 144 MW in the PJM queue, plus 6 with terminal status (shown greyed).
3active projects
144active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2252 | Wolf Glade 138 kV | 138 | 120 | Battery | Active |
| AG2-603 | Huffman 138 kV | 138 | 77 | Hybrid | Withdrawn |
| AG2-190 | Huffman 138 kV | 138 | 46.4 | Solar | Withdrawn |
| AH1-098 | Wolf Glade-West Carroll 138 kV | 138 | 24 | Hybrid | Active |
| AH1-097 | Jubal Early - Pipers Gap 138 kV | 138 | 12.9 | Hybrid | Withdrawn |
| AH1-172 | Wolf Glade 34.5 kV | 34.5 | 12 | Solar | Withdrawn |
| Y1-006 | Poplar Camp | 138 | 9.4 | Wind | Withdrawn |
| AH1-177 | Willis Gap 34.5 kV | 34.5 | 6 | Solar | Withdrawn |
| AD2-205 | Buck & Byllesby Hydro Project | 69 | 0 | Battery | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.