Dequine - Sullivan 345 kV
PJM queue ID C01-2190
Dequine - Sullivan 345 kV (C01-2190) is listed in the PJM interconnection queue as a 432.9 MW solar project in Vigo County, IN. The filing names Dequine - Sullivan as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of May 1, 2030.
| Queue ID | C01-2190 |
|---|---|
| Project name | Dequine - Sullivan 345 kV |
| Status (as published) | Active |
| Substation | Dequine - Sullivan |
| Point of interconnection | Dequine - Sullivan 345 kV |
| County | Vigo |
| State | IN |
| Voltage | 345 kV |
| Capacity | 432.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2030-05-01 |
| Source dataset | cycle |
Same substation and county
Dequine - Sullivan substation: 3 requests in the PJM queue, 2 active totaling 882.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2191 | Dequine - Sullivan 345 kV | 450 | Battery | Active |
| AG2-455 | Dequine - Sullivan 345 kV | 196 | Solar | Withdrawn |
Vigo, IN: 3 requests in the PJM queue, 2 active totaling 882.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Golden Glow Solar, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 450.0 |
| MW capacity | 432.9 |
| MFO | 450.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/8/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.