Evans Creek 230kV
PJM queue ID C01-1599
Evans Creek 230kV (C01-1599) is listed in the PJM interconnection queue as a 200 MW battery project in Mecklenburg County, VA. The filing names Evans Creek as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2032.
| Queue ID | C01-1599 |
|---|---|
| Project name | Evans Creek 230kV |
| Status (as published) | Active |
| Substation | Evans Creek |
| Point of interconnection | Evans Creek 230kV |
| County | Mecklenburg |
| State | VA |
| Voltage | 230 kV |
| Capacity | 200 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2032-12-31 |
| Source dataset | cycle |
Same substation and county
Evans Creek substation: 3 requests in the PJM queue, 3 active totaling 440 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1597 | Evans Creek 230kV | 159 | Solar | Active |
| C01-1598 | Evans Creek 230kV | 81 | Solar | Active |
Mecklenburg, VA: 61 requests in the PJM queue, 14 active totaling 990.3 MW.
A substation with the same name is named in PJM transmission planning materials: Evans Creek (DOM, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Scout Solar LandCo, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 200.0 |
| MW capacity | 200.0 |
| MFO | 600.0 |
| Submitted date | 4/27/2026 |
| Last updated | 5/29/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.