Sammis - South Canton 345 kV
PJM queue ID C01-1487
Sammis - South Canton 345 kV (C01-1487) is listed in the PJM interconnection queue as a 650 MW gas project in Carroll County, OH. The filing names Sammis - South Canton as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 30, 2030.
| Queue ID | C01-1487 |
|---|---|
| Project name | Sammis - South Canton 345 kV |
| Status (as published) | Active |
| Substation | Sammis - South Canton |
| Point of interconnection | Sammis - South Canton 345 kV |
| County | Carroll |
| State | OH |
| Voltage | 345 kV |
| Capacity | 650 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2030-08-30 |
| Source dataset | cycle |
Same substation and county
Sammis - South Canton substation: 3 requests in the PJM queue, 3 active totaling 2,881.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-680 | Sammis - South Canton 345 kV | 1,300 | Gas | Active |
| C01-1970 | Sammis - South Canton 345 kV | 931.1 | Gas | Active |
Carroll, OH: 12 requests in the PJM queue, 7 active totaling 4,698.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Rolling Hills Energy Center LLC |
|---|---|
| Transmission owner | ATSI |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 650.0 |
| MW capacity | 650.0 |
| MFO | 650.0 |
| Submitted date | 4/27/2026 |
| Last updated | 11/16/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.