Carroll, OH interconnection queue

6 active projects totalling 3,823.1 MW in the PJM queue, plus 5 with terminal status (shown greyed).

6active projects
3,823.1active MW
11total filed
Queue IDProjectkVMWResourceStatus
AH1-680 Sammis - South Canton 345 kV 345 1,300 Gas Active
Y2-085 Sammis–Star 345kV 345 1,050 Gas Withdrawn
C01-1970 Sammis - South Canton 345 kV 345 931.1 Gas Active
Y2-050 Carroll County Energy LLC n/r 672 Gas In Service
C01-1487 Sammis - South Canton 345 kV 345 650 Gas Active
C01-1878 Carrollton 138 kV 138 250 Battery Active
AH1-526 Echelon Solar 138 42 Hybrid Withdrawn
AH1-551 Not reported n/r 42 Solar Withdrawn
AH2-275 Carrollton Solar 138 kV 138 42 Solar Withdrawn
AC2-016 Carroll County Energy LLC 345 20 Gas In Service
AH1-236 Bane 69 kV 69 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.