Carroll, OH interconnection queue
6 active projects totalling 3,823.1 MW in the PJM queue, plus 5 with terminal status (shown greyed).
6active projects
3,823.1active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-680 | Sammis - South Canton 345 kV | 345 | 1,300 | Gas | Active |
| Y2-085 | Sammis–Star 345kV | 345 | 1,050 | Gas | Withdrawn |
| C01-1970 | Sammis - South Canton 345 kV | 345 | 931.1 | Gas | Active |
| Y2-050 | Carroll County Energy LLC | n/r | 672 | Gas | In Service |
| C01-1487 | Sammis - South Canton 345 kV | 345 | 650 | Gas | Active |
| C01-1878 | Carrollton 138 kV | 138 | 250 | Battery | Active |
| AH1-526 | Echelon Solar | 138 | 42 | Hybrid | Withdrawn |
| AH1-551 | Not reported | n/r | 42 | Solar | Withdrawn |
| AH2-275 | Carrollton Solar 138 kV | 138 | 42 | Solar | Withdrawn |
| AC2-016 | Carroll County Energy LLC | 345 | 20 | Gas | In Service |
| AH1-236 | Bane 69 kV | 69 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.