Peninsula 34.5 kV
PJM queue ID C01-1455
Peninsula 34.5 kV (C01-1455) is listed in the PJM interconnection queue as a 29.1 MW battery project in Hampton County, VA. The filing names Peninsula as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 30, 2028.
| Queue ID | C01-1455 |
|---|---|
| Project name | Peninsula 34.5 kV |
| Status (as published) | Active |
| Substation | Peninsula |
| Point of interconnection | Peninsula 34.5 kV |
| County | Hampton |
| State | VA |
| Voltage | 34.5 kV |
| Capacity | 29.1 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-04-30 |
| Source dataset | cycle |
Same substation and county
Peninsula substation: 2 requests in the PJM queue, 1 active totaling 29.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-164 | Langley AFB Generation | 26.7 | Gas | Withdrawn |
Hampton, VA: 1 request in the PJM queue, 1 active totaling 29.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Delorean Power LLC dba Lightshift Energy |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 29.12 |
| MW capacity | 29.12 |
| MFO | 29.12 |
| Submitted date | 4/27/2026 |
| Last updated | 6/8/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.