Substation Scout

Hampton, VA interconnection queue

1 active project totaling 29.1 MW in the PJM queue.

1active projects
29.1active MW
1total filed
Queue IDProjectkVMWResourceStatus
C01-1455 Peninsula 34.5 kV 34.5 29.1 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first