Hampton, VA interconnection queue

1 active project totalling 29.1 MW in the PJM queue.

1active projects
29.1active MW
1total filed
Queue IDProjectkVMWResourceStatus
C01-1455 Peninsula 34.5 kV 34.5 29.1 Battery Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.