Cranes Corner 34.5 kV (C01-1210) is listed in the PJM interconnection queue as a 2.9 MW solar project in Stafford County, VA. The filing names Cranes Corner as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of January 30, 2028.
| Queue ID | C01-1210 |
|---|---|
| Project name | Cranes Corner 34.5 kV |
| Status (as published) | Active |
| Substation | Cranes Corner |
| Point of interconnection | Cranes Corner 34.5 kV |
| County | Stafford |
| State | VA |
| Voltage | 34.5 kV |
| Capacity | 2.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-01-30 |
| Source dataset | cycle |
Same substation and county
Cranes Corner substation: 3 requests in the PJM queue, 1 active totaling 2.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| T10 | Stafford Regional LF | 3 | Gas | Deactivated |
| Q71 | Strafford Regional LF | 2 | Gas | Deactivated |
Stafford, VA: 5 requests in the PJM queue, 2 active totaling 252.9 MW.
A substation with the same name is named in PJM transmission planning materials: Cranes Corner (DOM, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Enon Road Solar LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 3.0 |
| MW capacity | 2.904 |
| MFO | 3.0 |
| Submitted date | 4/27/2026 |
| Last updated | 5/21/2026 |