George Washington 138 kV

PJM queue ID C01-1085

George Washington 138 kV (C01-1085) is listed in the PJM interconnection queue as a 700 MW gas project in Marshall County, WV. The filing names George Washington as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2030.

Queue IDC01-1085
Project nameGeorge Washington 138 kV
Status (as published)Active
SubstationGeorge Washington
Point of interconnectionGeorge Washington 138 kV
CountyMarshall
StateWV
Voltage138 kV
Capacity700 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2030-06-01
Source datasetcycle

Same substation and county

George Washington substation: 6 requests in the PJM queue, 1 active totaling 700 MW.

Queue IDProjectMWResourceStatus
Y3-068Moundsville Power, LLC525GasWithdrawn
AB2-141George Washington 138kV388.6GasWithdrawn
AD2-182George Washington 138 kV380GasWithdrawn
AB2-101George Washington 138kV31GasWithdrawn
Z2-048Moundsville Power, LLC20GasWithdrawn

Marshall, WV: 13 requests in the PJM queue, 2 active totaling 1,747 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperCalpine Mid-Atlantic Development, LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy735.54
MW capacity700.019
MFO735.54
Submitted date4/13/2026
Last updated6/19/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.