George Washington substation interconnection queue
1 active project totaling 700 MW in the PJM queue, plus 5 with terminal status (shown grayed).
6 PJM queue filings name George Washington as the point of interconnection, all in Marshall County, WV.
Target commercial operation dates as filed run from Dec 2018 to Jun 2030 (6 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
1active projects
700active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1085 | George Washington 138 kV | 138 | 700 | Gas | Active | Jun 2030 |
| Y3-068 | Moundsville Power, LLC | 138 | 525 | Gas | Withdrawn | Dec 2018 |
| AB2-141 | George Washington 138kV | 138 | 388.6 | Gas | Withdrawn | Apr 2019 |
| AD2-182 | George Washington 138 kV | 138 | 380 | Gas | Withdrawn | Apr 2022 |
| AB2-101 | George Washington 138kV | 138 | 31 | Gas | Withdrawn | Apr 2019 |
| Z2-048 | Moundsville Power, LLC | 138 | 20 | Gas | Withdrawn | Dec 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Marshall County, WV
No other substation in Marshall County, WV is named as a point of interconnection in the PJM queue.