George Washington substation interconnection queue

1 active project totaling 700 MW in the PJM queue, plus 5 with terminal status (shown grayed).

6 PJM queue filings name George Washington as the point of interconnection, all in Marshall County, WV.

Target commercial operation dates as filed run from Dec 2018 to Jun 2030 (6 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: AEP (1 filing).

1active projects
700active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1085 George Washington 138 kV 138 700 Gas Active Jun 2030
Y3-068 Moundsville Power, LLC 138 525 Gas Withdrawn Dec 2018
AB2-141 George Washington 138kV 138 388.6 Gas Withdrawn Apr 2019
AD2-182 George Washington 138 kV 138 380 Gas Withdrawn Apr 2022
AB2-101 George Washington 138kV 138 31 Gas Withdrawn Apr 2019
Z2-048 Moundsville Power, LLC 138 20 Gas Withdrawn Dec 2018

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Marshall County, WV

No other substation in Marshall County, WV is named as a point of interconnection in the PJM queue.

All 13 PJM queue filings in Marshall County, WV.