Substation Scout

Marshall, WV interconnection queue

2 active projects totalling 1,747 MW in the PJM queue, plus 11 with terminal status (shown greyed).

2active projects
1,747active MW
13total filed
Queue IDProjectkVMWResourceStatus
C01-1322 Kammer 345 kV 345 1,047 Gas Active
C01-1085 George Washington 138 kV 138 700 Gas Active
Y3-068 Moundsville Power, LLC 138 525 Gas Withdrawn
AH1-753 Not reported n/r 396 Gas Withdrawn
AB2-141 George Washington 138kV 138 388.6 Gas Withdrawn
AD2-182 George Washington 138 kV 138 380 Gas Withdrawn
AC2-179 Natrium 138kV 138 48.2 Gas Withdrawn
AB2-101 George Washington 138kV 138 31 Gas Withdrawn
AA2-098 George Washington (Moundsville) n/r 20 Gas Withdrawn
Z2-048 Moundsville Power, LLC 138 20 Gas Withdrawn
AB1-140 George Washington 138kV I 138 10 Gas Withdrawn
AB1-143 George Washington 138kV II 138 10 Gas Withdrawn
AB1-157 George Washington 138kV III 138 10 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.