Amos 765 kV
PJM queue ID C01-1035
Amos 765 kV (C01-1035) is listed in the PJM interconnection queue as a 13.1 MW coal project in Putnam County, WV. The filing names Amos as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 1, 2026.
| Queue ID | C01-1035 |
|---|---|
| Project name | Amos 765 kV |
| Status (as published) | Active |
| Substation | Amos |
| Point of interconnection | Amos 765 kV |
| County | Putnam |
| State | WV |
| Voltage | 765 kV |
| Capacity | 13.1 MW |
| Resource (as published) | Coal |
| Resource category | Coal (normalized for filtering) |
| Target commercial operation | 2026-04-01 |
| Source dataset | cycle |
Same substation and county
Amos substation: 3 requests in the PJM queue, 3 active totaling 33.1 MW.
Putnam, WV: 5 requests in the PJM queue, 4 active totaling 69.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Appalachian Power Company |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 13.1 |
| MFO | 1336.0 |
| Submitted date | 4/23/2026 |
| Last updated | 6/24/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.