Putnam, WV interconnection queue
4 active projects totalling 69.1 MW in the PJM queue, plus 1 with terminal status (shown greyed).
4active projects
69.1active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Y3-037 | John Amos Generating Plant Unit No. 3 | n/r | 36 | Coal | In Service |
| Q81 | AMOS 765kV | 765 | 20 | Coal | Withdrawn |
| C01-1035 | Amos 765 kV | 765 | 13.1 | Coal | Active |
| C01-1188 | Amos 765 kV | 765 | 10 | Coal | Active |
| C01-1204 | Amos 345 kV | 345 | 10 | Coal | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.