Flint Run 500 kV
PJM queue ID AG2-582
Flint Run 500 kV (AG2-582) is listed in the PJM interconnection queue as a 2,075 MW gas project in Doddridge County, WV. The filing names Flint Run as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 1, 2031.
| Queue ID | AG2-582 |
|---|---|
| Project name | Flint Run 500 kV |
| Status (as published) | Active |
| Substation | Flint Run |
| Point of interconnection | Flint Run 500 kV |
| County | Doddridge |
| State | WV |
| Voltage | 500 kV |
| Capacity | 2,075 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2031-03-01 |
| Source dataset | cycle |
Same substation and county
Flint Run substation: 2 requests in the PJM queue, 1 active totaling 2,075 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1563 | Flint Run 500 kV | 710 | Gas | Withdrawn |
Doddridge, WV: 4 requests in the PJM queue, 1 active totaling 2,075 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | CPV Shay, LLC |
|---|---|
| Transmission owner | APS |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 2100.0 |
| MW capacity | 2075.0 |
| MFO | 2100.0 |
| Submitted date | 3/31/2021 |
| Last updated | 9/1/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.