Flint Run substation interconnection queue
1 active project totaling 2,075 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Flint Run as the point of interconnection, all in Doddridge County, WV.
Target commercial operation dates as filed run from Mar 2031 to Jun 2032 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: APS (2 filings).
1active projects
2,075active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-582 | Flint Run 500 kV | 500 | 2,075 | Gas | Active | Mar 2031 |
| C01-1563 | Flint Run 500 kV | 500 | 710 | Gas | Withdrawn | Jun 2032 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Doddridge County, WV
No other substation in Doddridge County, WV is named as a point of interconnection in the PJM queue.