Doddridge, WV interconnection queue

1 active project totalling 2,075 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
2,075active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG2-582 Flint Run 500 kV 500 2,075 Gas Active
AE2-167 Belmont-Harrison 500 kV 500 1,315 Gas Withdrawn
C01-1563 Flint Run 500 kV 500 710 Gas Withdrawn
AE2-168 Belmont-Harrison 500 kV II 500 660 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.