Scioty Solar (AG1-554) is listed in the PJM interconnection queue as a 32.7 MW solar project in Hardin County, OH. The filing names South Kenton as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of October 1, 2027.

Queue IDAG1-554
Project nameScioty Solar
Status (as published)Engineering and Procurement
SubstationSouth Kenton
Point of interconnectionSouth Kenton 138 kV
CountyHardin
StateOH
Voltage138 kV
Capacity32.7 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-10-01
Source datasetserial

Same substation and county

South Kenton substation: 3 requests in the PJM queue, 1 active totaling 32.7 MW.

Queue IDProjectMWResourceStatus
AH1-539South Kenton 138 kV25.9HybridWithdrawn
AI2-194South Kenton 138 kV15.8SolarWithdrawn

Hardin, OH: 39 requests in the PJM queue, 18 active totaling 715 MW.

A substation with the same name is named in PJM transmission planning materials: South Kenton (AEP, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy49.99
MW capacity32.7
MFO49.99

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first