Top Crop Generating Facility
PJM queue ID AF2-319
Top Crop Generating Facility (AF2-319) is listed in the PJM interconnection queue as a 20 MW battery project in Lasalle County, IL. The filing names Katydid Road as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of March 31, 2029.
| Queue ID | AF2-319 |
|---|---|
| Project name | Top Crop Generating Facility |
| Status (as published) | EP |
| Substation | Katydid Road |
| Point of interconnection | Katydid Road 345 kV |
| County | Lasalle |
| State | IL |
| Voltage | 345 kV |
| Capacity | 20 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-03-31 |
| Source dataset | cycle |
Same substation and county
Katydid Road substation: 5 requests in the PJM queue, 4 active totaling 185.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1422 | Katydid Road 345 kV | 96 | Wind | Active |
| C01-1423 | Katydid Road 345 kV | 49.1 | Wind | Active |
| AF2-226 | Top Crop Generating Facility | 20 | Battery | EP |
| AF1-316 | Katydid Road 345 kV | 52.8 | Solar | Withdrawn |
Lasalle, IL: 27 requests in the PJM queue, 11 active totaling 530.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Blackstone Wind Farm, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 50.0 |
| MW capacity | 20.0 |
| MFO | 400.0 |
| Submitted date | 3/30/2020 |
| Last updated | 11/6/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.