Washington West Solar (AF2-234) is listed in the PJM interconnection queue as a 24 MW hybrid project in Snyder County, PA. The filing names Penns-Richfield Tie #1 as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 30, 2027.

Queue IDAF2-234
Project nameWashington West Solar
Status (as published)Under Construction
SubstationPenns-Richfield Tie #1
Point of interconnectionPenns-Richfield Tie #1 69 kV
CountySnyder
StatePA
Voltage69 kV
Capacity24 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalized for filtering)
Target commercial operation2027-12-30
Source datasetserial

Same substation and county

Penns-Richfield Tie #1 substation: 2 requests in the PJM queue, 2 active totaling 36 MW.

Queue IDProjectMWResourceStatus
AF2-233Washington East Solar12HybridUnder Construction

Snyder, PA: 26 requests in the PJM queue, 10 active totaling 1,152.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy40
MW capacity24
MFO40

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first