Frasier Solar

PJM queue ID AF2-149

Frasier Solar (AF2-149) is listed in the PJM interconnection queue as a 32 MW solar project in Knox County, OH. The filing names Sharp Road as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of July 4, 2029.

Queue IDAF2-149
Project nameFrasier Solar
Status (as published)Engineering and Procurement
SubstationSharp Road
Point of interconnectionSharp Road 69 kV
CountyKnox
StateOH
Voltage69 kV
Capacity32 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2029-07-04
Source datasetserial

Same substation and county

Sharp Road substation: 3 requests in the PJM queue, 2 active totaling 44.6 MW.

Queue IDProjectMWResourceStatus
AH1-059Sharp Road 69 kV12.6SolarActive
AI2-086Sharp Road 69 kV45SolarWithdrawn

Knox, OH: 5 requests in the PJM queue, 2 active totaling 44.6 MW.

A substation with the same name is named in PJM transmission planning materials: Sharp Road (AEP, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy80
MW capacity32
MFO80

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first