Knox, OH interconnection queue

2 active projects totalling 44.6 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
44.6active MW
5total filed
Queue IDProjectkVMWResourceStatus
AI2-438 Apple Valley 138kV 138 148 Solar Withdrawn
AH1-015 Academia 138 kV 138 90 Solar Withdrawn
AI2-086 Sharp Road 69 kV 69 45 Solar Withdrawn
AF2-149 Frasier Solar 69 32 Solar Engineering and Procurement
AH1-059 Sharp Road 69 kV 69 12.6 Solar Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.