Sharp Road substation interconnection queue
2 active projects totaling 44.6 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Sharp Road as the point of interconnection, all in Knox County, OH.
Target commercial operation dates as filed run from Dec 2025 to Jul 2029 (3 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-086 | Sharp Road 69 kV | 69 | 45 | Solar | Withdrawn | Dec 2025 |
| AF2-149 | Frasier Solar | 69 | 32 | Solar | Engineering and Procurement | Jul 2029 |
| AH1-059 | Sharp Road 69 kV | 69 | 12.6 | Solar | Active | Jan 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Sharp Road (AEP, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Knox County, OH
No other substation in Knox County, OH is named as a point of interconnection in the PJM queue.