Northwest Ohio Wind
PJM queue ID AF2-103
Northwest Ohio Wind (AF2-103) is listed in the PJM interconnection queue as a 1.3 MW hybrid project in Paulding County, OH. The filing names Haviland as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 1, 2021.
| Queue ID | AF2-103 |
|---|---|
| Project name | Northwest Ohio Wind |
| Status (as published) | In Service |
| Substation | Haviland |
| Point of interconnection | Haviland 138 kV |
| County | Paulding |
| State | OH |
| Voltage | 138 kV |
| Capacity | 1.3 MW |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2021-02-01 |
| Source dataset | serial |
Same substation and county
Haviland substation: 5 requests in the PJM queue, 3 active totaling 33.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE1-245 | Grover Hill Wind Project | 19.5 | Wind | Partially in Service - Under Construction |
| V1-011 | Trishe Wind Ohio, LLC | 13 | Wind | In Service |
| S117 | Haviland 138kV | 30 | Wind | Withdrawn |
| V1-012 | Trishe Wind Ohio, LLC | 19.5 | Wind | Withdrawn |
Paulding, OH: 28 requests in the PJM queue, 12 active totaling 250.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 3.15 |
| MW capacity | 1.32 |
| MFO | 103.15 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.