Northwest Ohio Wind

PJM queue ID AF2-103

Northwest Ohio Wind (AF2-103) is listed in the PJM interconnection queue as a 1.3 MW hybrid project in Paulding County, OH. The filing names Haviland as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 1, 2021.

Queue IDAF2-103
Project nameNorthwest Ohio Wind
Status (as published)In Service
SubstationHaviland
Point of interconnectionHaviland 138 kV
CountyPaulding
StateOH
Voltage138 kV
Capacity1.3 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalized for filtering)
Target commercial operation2021-02-01
Source datasetserial

Same substation and county

Haviland substation: 5 requests in the PJM queue, 3 active totaling 33.8 MW.

Queue IDProjectMWResourceStatus
AE1-245Grover Hill Wind Project19.5WindPartially in Service - Under Construction
V1-011Trishe Wind Ohio, LLC13WindIn Service
S117Haviland 138kV30WindWithdrawn
V1-012Trishe Wind Ohio, LLC19.5WindWithdrawn

Paulding, OH: 28 requests in the PJM queue, 12 active totaling 250.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy3.15
MW capacity1.32
MFO103.15

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.