Grover Hill Wind Project

PJM queue ID AE1-245

Grover Hill Wind Project (AE1-245) is listed in the PJM interconnection queue as a 19.5 MW wind project in Paulding County, OH. The filing names Haviland as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of February 5, 2026.

Queue IDAE1-245
Project nameGrover Hill Wind Project
Status (as published)Partially in Service - Under Construction
SubstationHaviland
Point of interconnectionHaviland 138 kV
CountyPaulding
StateOH
Voltage138 kV
Capacity19.5 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2026-02-05
Source datasetserial

Same substation and county

Haviland substation: 5 requests in the PJM queue, 3 active totaling 33.8 MW.

Queue IDProjectMWResourceStatus
V1-011Trishe Wind Ohio, LLC13WindIn Service
AF2-103Northwest Ohio Wind1.3HybridIn Service
S117Haviland 138kV30WindWithdrawn
V1-012Trishe Wind Ohio, LLC19.5WindWithdrawn

Paulding, OH: 28 requests in the PJM queue, 12 active totaling 250.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy140.3
MW capacity19.5
MFO140.3

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.