Substation Scout

Threeforks Energy Storage

PJM queue ID AF1-162

Threeforks Energy Storage (AF1-162) is listed in the PJM interconnection queue as a 60 MW battery project in Martin County, KY. The filing names Inez as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of May 31, 2028.

Queue IDAF1-162
Project nameThreeforks Energy Storage
Status (as published)Engineering and Procurement
SubstationInez
Point of interconnectionInez 138 kV
CountyMartin
StateKY
Voltage138 kV
Capacity60 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-05-31
Source datasetserial

Same substation and county

Inez substation: 6 requests in the PJM queue, 4 active totaling 467.8 MW.

Queue IDProjectMWResourceStatus
C01-1189Inez 138 kV140BatteryActive
AF1-130Martin County Solar Project133.9SolarSuspended
AF2-018Lynn Bark Energy Center133.9SolarEngineering and Procurement
AI2-334Inez 138 kV34.9SolarWithdrawn
AI2-335Inez 138 kV34.9SolarWithdrawn

Martin, KY: 8 requests in the PJM queue, 4 active totaling 467.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity60
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first