Inez substation interconnection queue
4 active projects totalling 467.8 MW in the PJM queue, plus 2 with terminal status (shown greyed).
4active projects
467.8active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1189 | Inez 138 kV | 138 | 140 | Battery | Active |
| AF1-130 | Martin County Solar Project | 138 | 133.9 | Solar | Suspended |
| AF2-018 | Lynn Bark Energy Center | 138 | 133.9 | Solar | Engineering and Procurement |
| AF1-162 | Threeforks Energy Storage | 138 | 60 | Battery | Engineering and Procurement |
| AI2-334 | Inez 138 kV | 138 | 34.9 | Solar | Withdrawn |
| AI2-335 | Inez 138 kV | 138 | 34.9 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.