Inez substation interconnection queue
4 active projects totaling 467.8 MW in the PJM queue, plus 2 with terminal status (shown grayed).
6 PJM queue filings name Inez as the point of interconnection, all in Martin County, KY.
Target commercial operation dates as filed run from Sep 2026 to Dec 2029 (6 filings). 4 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
4active projects
467.8active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1189 | Inez 138 kV | 138 | 140 | Battery | Active | Dec 2029 |
| AF1-130 | Martin County Solar Project | 138 | 133.9 | Solar | Suspended | Dec 2028 |
| AF2-018 | Lynn Bark Energy Center | 138 | 133.9 | Solar | Engineering and Procurement | Mar 2029 |
| AF1-162 | Threeforks Energy Storage | 138 | 60 | Battery | Engineering and Procurement | May 2028 |
| AI2-334 | Inez 138 kV | 138 | 34.9 | Solar | Withdrawn | Sep 2026 |
| AI2-335 | Inez 138 kV | 138 | 34.9 | Solar | Withdrawn | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Martin County, KY
No other substation in Martin County, KY is named as a point of interconnection in the PJM queue.
Site Scanner