Substation Scout

Martin County Solar Project

PJM queue ID AF1-130

Martin County Solar Project (AF1-130) is listed in the PJM interconnection queue as a 133.9 MW solar project in Martin County, KY. The filing names Inez as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 15, 2028.

Queue IDAF1-130
Project nameMartin County Solar Project
Status (as published)Suspended
SubstationInez
Point of interconnectionInez 138 kV
CountyMartin
StateKY
Voltage138 kV
Capacity133.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-12-15
Source datasetserial

Same substation and county

Inez substation: 6 requests in the PJM queue, 4 active totaling 467.8 MW.

Queue IDProjectMWResourceStatus
C01-1189Inez 138 kV140BatteryActive
AF2-018Lynn Bark Energy Center133.9SolarEngineering and Procurement
AF1-162Threeforks Energy Storage60BatteryEngineering and Procurement
AI2-334Inez 138 kV34.9SolarWithdrawn
AI2-335Inez 138 kV34.9SolarWithdrawn

Martin, KY: 8 requests in the PJM queue, 4 active totaling 467.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy190
MW capacity133.9
MFO190

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first