Martin County Solar Project
PJM queue ID AF1-130
Martin County Solar Project (AF1-130) is listed in the PJM interconnection queue as a 133.9 MW solar project in Martin County, KY. The filing names Inez as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 15, 2028.
| Queue ID | AF1-130 |
|---|---|
| Project name | Martin County Solar Project |
| Status (as published) | Suspended |
| Substation | Inez |
| Point of interconnection | Inez 138 kV |
| County | Martin |
| State | KY |
| Voltage | 138 kV |
| Capacity | 133.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-12-15 |
| Source dataset | serial |
Same substation and county
Inez substation: 6 requests in the PJM queue, 4 active totaling 467.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1189 | Inez 138 kV | 140 | Battery | Active |
| AF2-018 | Lynn Bark Energy Center | 133.9 | Solar | Engineering and Procurement |
| AF1-162 | Threeforks Energy Storage | 60 | Battery | Engineering and Procurement |
| AI2-334 | Inez 138 kV | 34.9 | Solar | Withdrawn |
| AI2-335 | Inez 138 kV | 34.9 | Solar | Withdrawn |
Martin, KY: 8 requests in the PJM queue, 4 active totaling 467.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 190 |
| MW capacity | 133.9 |
| MFO | 190 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.