Bedington Energy Facility

PJM queue ID AE2-333

Bedington Energy Facility (AE2-333) is listed in the PJM interconnection queue as a 60 MW solar project in Berkeley County, WV. The filing names Bedington as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of October 31, 2025.

Queue IDAE2-333
Project nameBedington Energy Facility
Status (as published)Suspended
SubstationBedington
Point of interconnectionBedington 138 kV
CountyBerkeley
StateWV
Voltage138 kV
Capacity60 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2025-10-31
Source datasetserial

Same substation and county

Bedington substation: 2 requests in the PJM queue, 2 active totaling 96.2 MW.

Queue IDProjectMWResourceStatus
C01-2218Bedington 138 kV36.2SolarActive

Berkeley, WV: 8 requests in the PJM queue, 4 active totaling 96.2 MW.

A substation with the same name is named in PJM transmission planning materials: Bedington (APS, 22 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity60
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first