Bedington Energy Facility
PJM queue ID AE2-333
Bedington Energy Facility (AE2-333) is listed in the PJM interconnection queue as a 60 MW solar project in Berkeley County, WV. The filing names Bedington as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of October 31, 2025.
| Queue ID | AE2-333 |
|---|---|
| Project name | Bedington Energy Facility |
| Status (as published) | Suspended |
| Substation | Bedington |
| Point of interconnection | Bedington 138 kV |
| County | Berkeley |
| State | WV |
| Voltage | 138 kV |
| Capacity | 60 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2025-10-31 |
| Source dataset | serial |
Same substation and county
Bedington substation: 2 requests in the PJM queue, 2 active totaling 96.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-2218 | Bedington 138 kV | 36.2 | Solar | Active |
Berkeley, WV: 8 requests in the PJM queue, 4 active totaling 96.2 MW.
A substation with the same name is named in PJM transmission planning materials: Bedington (APS, 22 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 100 |
| MW capacity | 60 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.