Elkhart County Solar Project
PJM queue ID AE2-323
Elkhart County Solar Project (AE2-323) is listed in the PJM interconnection queue as a 67.1 MW solar project in Elkhart County, IN. The filing names Twin Branch-Guardian as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 1, 2026.
| Queue ID | AE2-323 |
|---|---|
| Project name | Elkhart County Solar Project |
| Status (as published) | In Service |
| Substation | Twin Branch-Guardian |
| Point of interconnection | Twin Branch-Guardian 138 kV |
| County | Elkhart |
| State | IN |
| Voltage | 138 kV |
| Capacity | 67.1 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-05-01 |
| Source dataset | serial |
Same substation and county
Twin Branch-Guardian substation: 3 requests in the PJM queue, 1 active totaling 67.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE2-332 | Twin Branch-Guardian 138 kV | 208.8 | Battery | Withdrawn |
| AF1-046 | Twin Branch-Guardian 138 kV | 31.3 | Battery | Withdrawn |
Elkhart, IN: 8 requests in the PJM queue, 2 active totaling 71.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 100 |
| MW capacity | 67.1 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.