Twin Branch-Guardian substation interconnection queue
1 active project totaling 67.1 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Twin Branch-Guardian as the point of interconnection, all in Elkhart County, IN.
Target commercial operation dates as filed run from Dec 2021 to May 2026 (3 filings).
1active projects
67.1active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-332 | Twin Branch-Guardian 138 kV | 138 | 208.8 | Battery | Withdrawn | Dec 2021 |
| AE2-323 | Elkhart County Solar Project | 138 | 67.1 | Solar | In Service | May 2026 |
| AF1-046 | Twin Branch-Guardian 138 kV | 138 | 31.3 | Battery | Withdrawn | Dec 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Elkhart County, IN
- East Elkhart - Elcona Tap: none active of 2 filed
Site Scanner