Twin Branch-Guardian substation interconnection queue

1 active project totalling 67.1 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
67.1active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-332 Twin Branch-Guardian 138 kV 138 208.8 Battery Withdrawn
AE2-323 Elkhart County Solar Project 138 67.1 Solar In Service
AF1-046 Twin Branch-Guardian 138 kV 138 31.3 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.