Twin Branch-Guardian substation interconnection queue

1 active project totaling 67.1 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Twin Branch-Guardian as the point of interconnection, all in Elkhart County, IN.

Target commercial operation dates as filed run from Dec 2021 to May 2026 (3 filings).

1active projects
67.1active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-332 Twin Branch-Guardian 138 kV 138 208.8 Battery Withdrawn Dec 2021
AE2-323 Elkhart County Solar Project 138 67.1 Solar In Service May 2026
AF1-046 Twin Branch-Guardian 138 kV 138 31.3 Battery Withdrawn Dec 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Elkhart County, IN

All 8 PJM queue filings in Elkhart County, IN.