Substation Scout

Elkhart, IN interconnection queue

4 active projects totalling 271.9 MW in the PJM queue, plus 4 with terminal status (shown greyed).

4active projects
271.9active MW
8total filed
Queue IDProjectkVMWResourceStatus
AE2-332 Twin Branch-Guardian 138 kV 138 208.8 Battery Withdrawn
AG2-248 East Elkhart - Elcona Tap 138 kV 138 100 Battery Active
AG2-332 East Elkhart - Elcona Tap 138 kV 138 100 Battery Active
AG1-222 Guardian-Twin Branch 138 kV 138 90 Battery Withdrawn
AE2-323 Elkhart County Solar Project 138 67.1 Solar In Service
AG2-315 Twin Branch - Guardian 138 kV 138 60 Battery Withdrawn
AF1-046 Twin Branch-Guardian 138 kV 138 31.3 Battery Withdrawn
Y3-023 Wabash Valley Power Association, Inc. 12 4.8 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.