Yellow Wood Solar Energy Center (AE2-221) is listed in the PJM interconnection queue as a 180 MW solar project in Clinton County, OH. The filing names Clinton-Stuart as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 31, 2027.

Queue IDAE2-221
Project nameYellow Wood Solar Energy Center
Status (as published)Under Construction
SubstationClinton-Stuart
Point of interconnectionClinton-Stuart 345 kV
CountyClinton
StateOH
Voltage345 kV
Capacity180 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-12-31
Source datasetserial

Same substation and county

Clinton-Stuart substation: 4 requests in the PJM queue, 1 active totaling 180 MW.

Queue IDProjectMWResourceStatus
AF1-034Clinton-Stuart 345 kV180SolarWithdrawn
AF2-113Clinton-Stuart 345 kV75BatteryWithdrawn
AF1-035Clinton-Stuart 345 kV60SolarWithdrawn

Clinton, OH: 11 requests in the PJM queue, 6 active totaling 281.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy300
MW capacity180
MFO300

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first