Yellow Wood Solar Energy Center
PJM queue ID AE2-221
Yellow Wood Solar Energy Center (AE2-221) is listed in the PJM interconnection queue as a 180 MW solar project in Clinton County, OH. The filing names Clinton-Stuart as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 31, 2027.
| Queue ID | AE2-221 |
|---|---|
| Project name | Yellow Wood Solar Energy Center |
| Status (as published) | Under Construction |
| Substation | Clinton-Stuart |
| Point of interconnection | Clinton-Stuart 345 kV |
| County | Clinton |
| State | OH |
| Voltage | 345 kV |
| Capacity | 180 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | serial |
Same substation and county
Clinton-Stuart substation: 4 requests in the PJM queue, 1 active totaling 180 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-034 | Clinton-Stuart 345 kV | 180 | Solar | Withdrawn |
| AF2-113 | Clinton-Stuart 345 kV | 75 | Battery | Withdrawn |
| AF1-035 | Clinton-Stuart 345 kV | 60 | Solar | Withdrawn |
Clinton, OH: 11 requests in the PJM queue, 6 active totaling 281.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 300 |
| MW capacity | 180 |
| MFO | 300 |