Pleasant Prairie Solar Energy Center

PJM queue ID AE2-214

Pleasant Prairie Solar Energy Center (AE2-214) is listed in the PJM interconnection queue as a 120 MW solar project in Franklin County, OH. The filing names Cole as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of December 30, 2027.

Queue IDAE2-214
Project namePleasant Prairie Solar Energy Center
Status (as published)Partially in Service - Under Construction
SubstationCole
Point of interconnectionCole 345 kV
CountyFranklin
StateOH
Voltage345 kV
Capacity120 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-12-30
Source datasetserial

Same substation and county

Cole substation: 3 requests in the PJM queue, 2 active totaling 144 MW.

Queue IDProjectMWResourceStatus
AF1-275Pleasant Prairie Solar Energy Center24SolarPartially in Service - Under Construction
AH1-318Cole 345 kV60BatteryWithdrawn

Franklin, OH: 20 requests in the PJM queue, 5 active totaling 218 MW.

A substation with the same name is named in PJM transmission planning materials: Cole (AEP, 5 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-11-02 Status change n/a Under Construction → Partially in Service - Under Construction

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity120
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first