Rocky Ford Solar Energy Center

PJM queue ID AE2-166

Rocky Ford Solar Energy Center (AE2-166) is listed in the PJM interconnection queue as a 54 MW solar project in Henry County, VA. The filing names Stockton as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 31, 2026.

Queue IDAE2-166
Project nameRocky Ford Solar Energy Center
Status (as published)Suspended
SubstationStockton
Point of interconnectionStockton 138 kV
CountyHenry
StateVA
Voltage138 kV
Capacity54 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-12-31
Source datasetserial

Same substation and county

Stockton substation: 6 requests in the PJM queue, 2 active totaling 75.6 MW.

Queue IDProjectMWResourceStatus
C01-1654Stockton 138 kV21.6SolarActive
AI2-137Stockton 138 kV21.6SolarWithdrawn
AC1-117Leatherwood7.6SolarWithdrawn
AB2-167Stockton 69kV5.3SolarWithdrawn
AE2-245Stockton 34.5 kV5.3SolarWithdrawn

Henry, VA: 19 requests in the PJM queue, 7 active totaling 1,053.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy90
MW capacity54
MFO90

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.