Northern Bobwhite Solar

PJM queue ID AE1-143

Northern Bobwhite Solar (AE1-143) is listed in the PJM interconnection queue as a 64.2 MW solar project in Marion County, KY. The filing names Marion County as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of October 15, 2027.

Queue IDAE1-143
Project nameNorthern Bobwhite Solar
Status (as published)Under Construction
SubstationMarion County
Point of interconnectionMarion County 161 kV
CountyMarion
StateKY
Voltage161 kV
Capacity64.2 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-10-15
Source datasetserial

Same substation and county

Marion County substation: 3 requests in the PJM queue, 1 active totaling 64.2 MW.

Queue IDProjectMWResourceStatus
AF1-116Marion County 161 kV72SolarWithdrawn
AI2-066Marion County 161 kV16.4SolarWithdrawn

Marion, KY: 8 requests in the PJM queue, 1 active totaling 64.2 MW.

A substation with the same name is named in PJM transmission planning materials: Marion County (EKPC, 4 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy96
MW capacity64.163
MFO96

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.