Nelson Energy Center
PJM queue ID AE1-134
Nelson Energy Center (AE1-134) is listed in the PJM interconnection queue as a 24.4 MW gas project in Lee County, IL. The filing names Nelson as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2023.
| Queue ID | AE1-134 |
|---|---|
| Project name | Nelson Energy Center |
| Status (as published) | In Service |
| Substation | Nelson |
| Point of interconnection | Nelson 345 kV |
| County | Lee |
| State | IL |
| Voltage | 345 kV |
| Capacity | 24.4 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2023-06-30 |
| Source dataset | serial |
Same substation and county
Nelson substation: 14 requests in the PJM queue, 7 active totaling 1,057.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| R33 | Nelson Energy Center | 600 | Gas | In Service |
| AA1-146 | Invenergy Nelson Expansion LLC | 157 | Gas | In Service |
| AA2-030 | Invenergy Nelson Expansion LLC | 157 | Gas | In Service |
| C01-1615 | Nelson 69 kV | 75 | Battery | Active |
| AH1-718 | Nelson 345 kV | 38 | Gas | Active |
| C01-1171 | Nelson 345 kV | 6 | Gas | Active |
| U2-095 | Nelson 345kV | 600 | Gas | Withdrawn |
| C01-1768 | Nelson 345 kV | 375 | Battery | Withdrawn |
| AH2-015 | Nelson 138 kV | 110 | Battery | Withdrawn |
| AH1-657 | Nelson 345 kV | 60 | Solar | Withdrawn |
| AF2-385 | Nelson 69 kV | 47.8 | Solar | Withdrawn |
| AB2-173 | Nelson 345kV | 28 | Gas | Withdrawn |
1 more on the substation page.
Lee, IL: 106 requests in the PJM queue, 30 active totaling 2,565.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 9 |
| MW capacity | 24.4 |
| MFO | 609 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.