Invenergy Nelson Expansion LLC
PJM queue ID AA1-146
Invenergy Nelson Expansion LLC (AA1-146) is listed in the PJM interconnection queue as a 157 MW gas project in Lee County, IL. The filing names Nelson as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 31, 2023.
| Queue ID | AA1-146 |
|---|---|
| Project name | Invenergy Nelson Expansion LLC |
| Status (as published) | In Service |
| Substation | Nelson |
| Point of interconnection | Nelson |
| County | Lee |
| State | IL |
| Voltage | Not reported |
| Capacity | 157 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2023-05-31 |
| Source dataset | serial |
Same substation and county
Nelson substation: 14 requests in the PJM queue, 7 active totaling 1,057.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| R33 | Nelson Energy Center | 600 | Gas | In Service |
| AA2-030 | Invenergy Nelson Expansion LLC | 157 | Gas | In Service |
| C01-1615 | Nelson 69 kV | 75 | Battery | Active |
| AH1-718 | Nelson 345 kV | 38 | Gas | Active |
| AE1-134 | Nelson Energy Center | 24.4 | Gas | In Service |
| C01-1171 | Nelson 345 kV | 6 | Gas | Active |
| U2-095 | Nelson 345kV | 600 | Gas | Withdrawn |
| C01-1768 | Nelson 345 kV | 375 | Battery | Withdrawn |
| AH2-015 | Nelson 138 kV | 110 | Battery | Withdrawn |
| AH1-657 | Nelson 345 kV | 60 | Solar | Withdrawn |
| AF2-385 | Nelson 69 kV | 47.8 | Solar | Withdrawn |
| AB2-173 | Nelson 345kV | 28 | Gas | Withdrawn |
1 more on the substation page.
Lee, IL: 106 requests in the PJM queue, 30 active totaling 2,565.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 190 |
| MW capacity | 157 |
| MFO | 190 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.