Maidsville CCGT
PJM queue ID AE1-105
Maidsville CCGT (AE1-105) is listed in the PJM interconnection queue as a 1,235 MW gas project in Preston County, WV. The filing names North Longview as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of June 30, 2031.
| Queue ID | AE1-105 |
|---|---|
| Project name | Maidsville CCGT |
| Status (as published) | Engineering and Procurement |
| Substation | North Longview |
| Point of interconnection | North Longview 500 kV |
| County | Preston |
| State | WV |
| Voltage | 500 kV |
| Capacity | 1,235 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2031-06-30 |
| Source dataset | serial |
Same substation and county
North Longview substation: 4 requests in the PJM queue, 2 active totaling 1,245 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AC1-140 | Longview Power | 10 | Coal | In Service |
| AI2-443 | North Longview 500 kV | 295 | Hybrid | Withdrawn |
| AF1-297 | North Longview 500 kV | 31.7 | Solar | Withdrawn |
Preston, WV: 24 requests in the PJM queue, 2 active totaling 1,466 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 1270 |
| MW capacity | 1235 |
| MFO | 1270 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.