Black Rock Wind (AD2-180) is listed in the PJM interconnection queue as a 15.1 MW wind project in Mineral County, WV. The filing names Elk Garden-Parr Run as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 15, 2021.

Queue IDAD2-180
Project nameBlack Rock Wind
Status (as published)In Service
SubstationElk Garden-Parr Run
Point of interconnectionElk Garden-Parr Run 138kV
CountyMineral
StateWV
Voltage138 kV
Capacity15.1 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2021-12-15
Source datasetserial

Same substation and county

Elk Garden-Parr Run substation: 2 requests in the PJM queue, 1 active totaling 15.1 MW.

Queue IDProjectMWResourceStatus
U3-025Elk Garden-Parr Run 138kV10.4WindWithdrawn

Mineral, WV: 9 requests in the PJM queue, 4 active totaling 82.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy110
MW capacity15.08
MFO110

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first