Black Rock Wind
PJM queue ID AD2-180
Black Rock Wind (AD2-180) is listed in the PJM interconnection queue as a 15.1 MW wind project in Mineral County, WV. The filing names Elk Garden-Parr Run as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 15, 2021.
| Queue ID | AD2-180 |
|---|---|
| Project name | Black Rock Wind |
| Status (as published) | In Service |
| Substation | Elk Garden-Parr Run |
| Point of interconnection | Elk Garden-Parr Run 138kV |
| County | Mineral |
| State | WV |
| Voltage | 138 kV |
| Capacity | 15.1 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2021-12-15 |
| Source dataset | serial |
Same substation and county
Elk Garden-Parr Run substation: 2 requests in the PJM queue, 1 active totaling 15.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| U3-025 | Elk Garden-Parr Run 138kV | 10.4 | Wind | Withdrawn |
Mineral, WV: 9 requests in the PJM queue, 4 active totaling 82.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 110 |
| MW capacity | 15.08 |
| MFO | 110 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.